10
MAINTENANCE
Mod. PAGURO
6000/9000/14000/18000/6500/8500
Date: 12.03.2020_Rev: 0.0
6
OPERATIONS TO BE CARRIED OUT EVERY 300 HOURS
Replace the engine oil by pulling it out with the oil pump.
OPERATIONS TO BE CARRIED OUT EVERY 500 HOURS
Clean the heat exchanger tube nest.
Adjust the rocker arm clearance at a Service Centre authorized by the Manufacturer
VTE S.r.l.
OPERATIONS TO BE CARRIED OUT EVERY 1000 HOURS
Perform calibration and cleaning of injectors at a Service Centre authorized by the Manufacturer
VTE
S.r.l.
OPERATIONS TO BE CARRIED OUT EVERY 2500 HOURS
Perform partial overhaul of the generator at a Service Centre authorized by the Manufacturer
VTE
S.r.l.
OPERATIONS TO BE CARRIED OUT EVERY 5000 HOURS
Perform general overhaul of the generator at a Service Centre authorized by the Manufacturer
VTE
S.r.l.
10.3 EXTRAORDINARY MAINTENANCE
Extraordinary maintenance operations concern breakages of parts and components where specific knowledge
of the fault is required.
In this case contact the Manufacturer.
WARNING! All the interventions of extraordinary maintenance must be performed only with the
generator not working and in safety conditions (generator in "maintenance state").
The operations of extraordinary maintenance must be performed by personnel authorized and trained
by the manufacturer.
Competences of the technical electrician, extraordinary maintenance technician.
The extraordinary maintenance electrician is a technician employed by the Manufacturer or by his authorized
service centres.
He is the operator responsible for the extraordinary maintenance of the electrical system. This individual must
have a technical training and qualification, a specialized experience, a knowledge of the generator and of the
User and Maintenance Manual.
Furthermore he/she must be continuously updated, through specific training courses at the headquarter of the
Manufacturer and must have the knowledge and the required documentation to safely carry out complicated
procedures on the systems.
The extraordinary maintenance technician is authorised to:
– intervene on parts of the system that are critical to safety;
– make any changes to the connections and wiring on the generator;
– replace devices and components with others that may be different to the originals;
– make changes to the software of the generator;
– change the parameters set on the electronic devices.
Содержание PAGURO 8500
Страница 2: ......
Страница 75: ...12 ELECTRICAL DRAWINGS Mod PAGURO 6000 9000 14000 18000 6500 8500 Date 12 03 2020_Rev 0 0 1 PAGURO 6000 9000 ...
Страница 76: ...12 ELECTRICAL DRAWINGS Mod PAGURO 6000 9000 14000 18000 6500 8500 Date 12 03 2020_Rev 0 0 2 PAGURO 14000 18000 ...
Страница 77: ...12 ELECTRICAL DRAWINGS Mod PAGURO 6000 9000 14000 18000 6500 8500 Date 12 03 2020_Rev 0 0 3 PAGURO 6500 ...
Страница 83: ......