IN
INDEX
Mod. PAGURO
6000/9000/14000/18000/6500/8500
Date: 12.03.2020_Rev: 0.0
2
PAGE
3.3.2
Qualified technician............................................................................. 1
3.4
Categories of operators authorised to work and intervene on the generator....
1
3.4.1 Installers……………………………………………………………………….
1
3.4.2
Ordinary maintainers……………………………………………………... 2
3.4.3
Extraordinary maintainers…………………………….……………….…
2
3.5
Exposure to hazards and risks from materials…………………………………...
2
3.6
Operators training…………..………………….……….………………..…………
2
4. TRANSPORT AND HANDLING
4
Transport and handling……………………………………………………………………….
1
4.1
General notions……..……………………………………………………………....
1
4.2
Transport and handling……………………………………………………………..
2
4.2.1
Lifting and handling by crane or overhead crane………….…..………
2
4.2.2
Lifting and handling with forklift………………………………………….. 4
4.3
Unpacking……………………………………………………………………….…..
5
4.4
Handling the unpacked generator……..……………………………………...…...
5
4.5
Storage…..……………………………………………………………………….….
7
4.6
Shipping…..………………………………………………………………..……..…
7
4.7
Inspection on arrival…….…………………………………………………………..
7
5. INSTALLATION OF THE GENERATOR
5
Installation of the generator..………………………………………..……………….…….…
1
5.1
Set up for installation…………….……..………………………………….……..… 1
5.2
Fixing the generator…………………………………………………..……………… 1
5.3
Ventilation……………………………………………………………………….……
2
5.4
External connections………………………………………………………………… 3
5.5
Exhaust system installation (on request)…………………………….……………. 4
5.5.1
Traditional system…………………………………………………………… 5
5.5.2
On-board system with space shortage………………………………….…. 6
5.5.3
On-board system with long exhaust line…………………………………... 7
5.6
Fuel line…………………..………………………………….…………………..
7
5.7
Installation of the cooling system……………………………………………..…..…. 9
5.7.1
Siphon-break valve…………………………………………………………. 10
5.7.2
Raw water intake (on request)…………………………………………..… 11
5.8
Electrical connection………………………………………………………………….. 11
5.8.1
Connection to starting battery…………………………….......................... 11
5.8.2
Main output voltage………………………….…………….….……….
12
5.8.3
Transfer switch over shore line/generator ……………………..…..
13
5.8.4
Remote control panel……………………………………………….....
14
5.9
Pre-start inspections………………………………………………………………….. 15
5.10
Testing..............................................................................................................
15
6. INSTALLATION ERRORS
6
Installation errors………………………………………………………………………………
1
6.1
Water intake…….…………………………………………………………….………… 1
6.2
Waterline……………………………………………………………………………..
1
Содержание PAGURO 8500
Страница 2: ......
Страница 75: ...12 ELECTRICAL DRAWINGS Mod PAGURO 6000 9000 14000 18000 6500 8500 Date 12 03 2020_Rev 0 0 1 PAGURO 6000 9000 ...
Страница 76: ...12 ELECTRICAL DRAWINGS Mod PAGURO 6000 9000 14000 18000 6500 8500 Date 12 03 2020_Rev 0 0 2 PAGURO 14000 18000 ...
Страница 77: ...12 ELECTRICAL DRAWINGS Mod PAGURO 6000 9000 14000 18000 6500 8500 Date 12 03 2020_Rev 0 0 3 PAGURO 6500 ...
Страница 83: ......