Pro
te
c
t
ed
b
y
co
p
y
rig
h
t.
C
o
p
y
in
g
fo
r
pr
iv
a
t
e
o
r
c
o
m
m
e
r
c
ia
l
p
u
rp
o
s
e
s
,
i
n
p
a
rt
o
r i
n
w
h
o
le
,
is
n
o
t
p
e
r
m
it
t
e
d
u
n
l
e
s
s
a
ut
ho
r
i
s
ed
b
y
V
olk
sw
a
ge
n AG
.
V
olk
s
w
a
g
en
AG do
es
n
ot g
uar
ante
e
or a
c
c
ep
t
a
ny
li
a
b
i
li
t
y
w
ith
r
e
s
p
e
c
t
t
o
th
e
c
o
rr
e
c
t
n
e
s
s
o
f
in
fo
r
m
a
tio
n
in
th
is
d
o
c
um
en
t.
C
o
py
rig
ht b
y
V
olk
sw
a
ge
n
A
G.
– Undo and remove the 2 nuts -arrows- and remove electrocon‐
ductive plate -1- and multiple fuse -2- from electronics box.
– Turn electronics box over, release locking lug -arrow- and pull
fuse holder -1- upwards off the electronics box.
– Press catches at sides -arrows- and remove lid of fuse holder
-1-.
– Make a note of the fuse assignment and remove all fuses from
the fuse holder.
– Pull primary locking element -1- in -direction of arrow-, release
all plug-in contacts with the correct release tool from the re‐
lease tool set - VAS 1978/35- and then pull downwards out of
the fuse holder.
Note
The assignment of the correct release tool is shown in the table
in the ⇒ operating instructions for the -VAS 1978/35-
Installing
Install in the reverse order of removal observing the following:
up! 2012 ➤
Electrical system - Edition 03.2017
146
Rep. gr.97 - Wiring