300004969171/B
Page 115 of 148
3.
Carefully observe electrostatic discharge (ESD) precautions.
Cable Inspection
Check placement of PIM cable and connector, and ensure cable is protected from
accidental damage
Inspect cable connections to ensure secure connections
Volcano-Certified Maintenance
Volcano-certified maintenance is performed by Volcano-certified service engineers only.
A comprehensive inspection, operational check, entire system test, and check of any
installed options are required.
Содержание CORE Mobile
Страница 19: ...300004969171 B Page 19 of 148 This page is intentionally blank for pagination purposes...
Страница 28: ...Page 28 of 148 300004969171 B Figure 10 Connector Panel...
Страница 38: ...Page 38 of 148 300004969171 B Figure 16 Settings VH IVUS Defaults...
Страница 43: ...300004969171 B Page 43 of 148 This page is intentionally blank for pagination purposes...
Страница 66: ...Page 66 of 148 300004969171 B This page is intentionally blank for pagination purposes...
Страница 85: ...300004969171 B Page 85 of 148 This page is intentionally blank for pagination purposes...
Страница 91: ...300004969171 B Page 91 of 148 This page is intentionally blank for pagination purposes...
Страница 93: ...300004969171 B Page 93 of 148 This page is intentionally blank for pagination purposes...
Страница 110: ...Page 110 of 148 300004969171 B This page is intentionally blank for pagination purposes...
Страница 116: ...Page 116 of 148 300004969171 B This page is intentionally blank for pagination purposes...