
Ultra Installation Guide v2.0
53
Customer Support
1.800.366.5343 –
VZ0022UG201509-2.0
Install Guide Checklist
Unpack Items and verify items received.
Mount Tube Neck to Stand
Bolt Front Control Panel to Tube Neck
Stand Sedecal Stand up and level
Bolt stand to the floor and wall
Place Stand Power Box on right of stand
Install J5 cable from Stand Box to Generator
Place Generator on top of Stand Power Box
Bolt Generator to Stand Power Box Wire Stand Power Box
Install Tube
Install Collimator (rotate tube upside down for ease)
Run panel Generator Interface cable and Network Cable through stand
Disassemble enclosure
Mount enclosure plate
Level Enclosure mount by adjusting set screws
Install panel (mounting holes are available)
Pull all cables to control area (Network from panel, Mini-Console J5, Mini-Console Ground)
Install and wire Computer in Control Area
Mount Mini-Console
Wire Panel Power Supply (Blue power cable and wall power cable)
Wire Generator (J5 from Stand Power Box if Uarm, AEC Cable from Stand, J4 from Panel Power Supply,
High Voltage Cables, Rotor Cable, Grounds from Stand Box and Mini-Console)
Install Jumpers in Generator (3TS1-2 to 3TS1-7, AEC Adapt Board 7 to 10, And if necessary Door Interlock
3TS1-22 to 3TS1-23)
Turn on Stand
Calibrate stand as per Install Guide for Uarm
Turn on Generator (error 98 is common, Service mode)
Verify connection to panel, Start Acquisition software and verify panel is in Ready state.
Verify Generator communication by selecting Tech Service from the desktop). Vizion software and Tech
Service cannot run at the same time (they both use COM port 1)
Check and adjust configuration in Tech Service
•
WS 1
Tube 1
Bucky 1
IC 1 (if in J1 on the AEC Adaption Board in Generator)
•
WS 3
Tube 1
Direct
IC 1 (if in J1 on the AEC Adaption Board in Generator)