![vitro Vitrolux H V2 Скачать руководство пользователя страница 24](http://html1.mh-extra.com/html/vitro/vitrolux-h-v2/vitrolux-h-v2_user-manual_1037568024.webp)
Vitrolux H
V2
Transport und installation
Stand 5/12
Page 24 of 57
2.3 Installation
Prepare the installation site for the laser system. The system must be installed on a clean,
level site.
Caution
The foundation must have a minimum load-bearing capacity of 300 kg/m
2
Remove the cover and side panel marked „Front“ from the transport crate.
Lift the laser system from the euro pallet
Position the laser system at the intended installation site.
Trained electricians should make the cable connections between the laser system and mains
power supply with the power supply itself
switched
off.
Caution
The laser may only be switched on when all the cables have been connected
properly.