Checking the condensate drain and cleaning the siphon
1.
Pull off cap
A
downwards.
2.
Undo union nut
B
and pull off
siphon
C
downwards.
3.
Clean siphon
C
and check that the
condensate can freely drain off.
4.
Fill siphon
C
with water and reas-
semble.
5.
Push on cap
A
from below.
Checking the diaphragm expansion vessel and system pres-
sure
Note
Carry out this test on a cold system.
1.
Drain the system, or close the cap
valve on the diaphragm expansion
vessel and reduce the pressure,
until the pressure gauge indicates
"0".
2.
If the inlet pressure of the dia-
phragm expansion vessel is lower
than the static system pressure,
top up with nitrogen until the inlet
pressure is raised by 0.1 to 0.2 bar.
3.
Top up your heating system with
water and vent until the filling pres-
sure of a cooled system is 0.1 to
0.2 bar higher than the inlet pres-
sure of the diaphragm expansion
vessel.
Permiss. operating pressure: 4 bar
Checking all gas equipment for tightness at operating pres-
sure
Danger
Escaping gas leads to a risk of
explosion.
Check gas equipment for tight-
ness.
Further details regarding the individual steps
(cont.)
22
Commissioning, inspection, maintenance
5692
761
GB
Содержание Vitodens 200-W WB2B Series
Страница 105: ...A1 Main PCB A2 Power supply unit Connection and wiring diagram external connections 105 Designs 5692 761 GB...
Страница 109: ...Parts lists cont 109 Parts lists 5692 761 GB...
Страница 110: ...Parts lists cont 110 Parts lists 5692 761 GB...
Страница 111: ...Parts lists cont 111 Parts lists 5692 761 GB...
Страница 118: ...118 5692 761 GB...
Страница 119: ...119 5692 761 GB...