6.
Adjust the upper output.
Constant temperature control
unit:
a
press:
"
2
" is shown.
Weather-compensated control
unit:
a
press:
"
Full load
" is shown.
7.
Check the CO
2
content. Should the
actual value deviate by more than
1% from the above ranges, check
the balanced flue system for tight-
ness, see page 16.
8.
After testing, press
d
.
9.
Enter actual values into the service
report.
Matching the control unit to the heating system
The control unit must be matched to the equipment level of the system. Various
system components are recognised automatically by the control unit and the
relevant codes are adjusted automatically.
&
For the selection of an appropriate design, see the following diagrams.
&
For coding steps, see page 36.
Further details regarding the individual steps
(cont.)
24
Commissioning, inspection, maintenance
5692
761
GB
Содержание Vitodens 200-W WB2B Series
Страница 105: ...A1 Main PCB A2 Power supply unit Connection and wiring diagram external connections 105 Designs 5692 761 GB...
Страница 109: ...Parts lists cont 109 Parts lists 5692 761 GB...
Страница 110: ...Parts lists cont 110 Parts lists 5692 761 GB...
Страница 111: ...Parts lists cont 111 Parts lists 5692 761 GB...
Страница 118: ...118 5692 761 GB...
Страница 119: ...119 5692 761 GB...