2.
Press
K
and
F
simultaneously
until a value flashes (e.g. "85") and
"
A
" appears. In the delivered con-
dition, this value represents 100 %
of rated output.
On weather-compensated control
units, the display additionally
shows
"Max. output"
.
3.
With
a
/
b
select the required
value in % of rated output as maxi-
mum output.
4.
Confirm the set value with
d
.
5.
Record the settings for maximum
output on the additional type plate
included with the "technical docu-
mentation". Affix the type plate next
to the original type plate on top of
the boiler.
Note
The output can also be limited for
DHW heating. For this, change coding
address "6F" in code 2.
Checking the balanced flue system for tightness (annular
gap check)
A
Combustion air port
For balanced flue systems tested
together with the wall mounted gas
fired boiler, some authorities waive
the requirement for a soundness test
(overpressure test) during commis-
sioning by the flue gas inspector.
We recommend that your heating
engineer carries out a simple sound-
ness test during the commissioning of
your system. For this, it would be suf-
ficient to check the CO
2
or O
2
concen-
tration in the combustion air at the
annular gap of the balanced flue pipe.
Further details regarding the individual steps
(cont.)
16
Commissioning, inspection, maintenance
5692
761
GB
Содержание Vitodens 200-W WB2B Series
Страница 105: ...A1 Main PCB A2 Power supply unit Connection and wiring diagram external connections 105 Designs 5692 761 GB...
Страница 109: ...Parts lists cont 109 Parts lists 5692 761 GB...
Страница 110: ...Parts lists cont 110 Parts lists 5692 761 GB...
Страница 111: ...Parts lists cont 111 Parts lists 5692 761 GB...
Страница 118: ...118 5692 761 GB...
Страница 119: ...119 5692 761 GB...