70
Commissioning steps
Inspection steps
Maintenance steps
Page
•
•
•
19. Closing the heat pump; resetting the circuit breaker/
main fuse
•
•
•
20. Starting the heat pump
................................................... 83
•
21. Commissioning the system
........................................... 83
•
22. Ticking the heat pump type on the type plate of the
internal unit (as per external unit type plate)
•
•
•
23. Checking the heat pump for unusual noises (e.g.
operating noise of fan, compressor or pump); venting
again if required
•
•
•
24. Checking the system function (e.g. actuators,
temperatures, heat meter if applicable)
........................ 92
•
25. Instructing the system user
........................................... 93
Commissioning, inspection, maintenance
Steps - commissioning, inspection and…
(cont.)
5623 661 GB
Содержание Vitocal 242-S
Страница 26: ...26 6 8 P301 P501 P303 P302 X25 F23 F6 7 Installation sequence Installing the internal unit cont 5623 661 GB ...
Страница 27: ...27 SLP N 9 11 aCH sG lJ 10 Installation sequence Installing the internal unit cont 5623 661 GB Installation ...
Страница 28: ...28 X20 2x 16 17 2x 12 14 18 13 15 Installation sequence Installing the internal unit cont 5623 661 GB ...
Страница 29: ...29 2x 4x 4x 6x 21 19 20 22 Installation sequence Installing the internal unit cont 5623 661 GB Installation ...
Страница 32: ...32 Installation sequence Installing the internal unit cont 5623 661 GB ...
Страница 95: ...95 Removing cover from programming unit if necessary 5 4 4x Troubleshooting Repairs cont 5623 661 GB Service ...
Страница 110: ...110 0003 0006 0005 0008 0007 0001 0009 0010 0002 0004 Parts lists internal unit Internal unit casing cont 5623 661 GB ...