38
1.
Remove nuts from refrigerant con-
nections
C
and
D
and slide onto
the supplied pipe bends.
2.
Flare the pipe ends of the supplied
pipe bends on the short side.
Note
Flare the pipe end of the hot gas line
by approx. 0.5 mm.
3.
Remove the locking caps from the
internal unit connections and secure
the pipe bends with the short side.
Insulate them to provide protection
from heat and vapour diffusion.
Note
■ The long side of the pipe bends
must point upwards.
■ Pipe bends must not be positioned
diagonally. Check that the flared
connections are firmly seated.
4.
Slide the supplied union nuts
(⅝ UNF for liquid line, ⅞ UNF for hot
gas line) over the open end of the
pipe bends.
Installation sequence
Connecting refrigerant lines
(cont.)
5623 661 GB
Содержание Vitocal 242-S
Страница 26: ...26 6 8 P301 P501 P303 P302 X25 F23 F6 7 Installation sequence Installing the internal unit cont 5623 661 GB ...
Страница 27: ...27 SLP N 9 11 aCH sG lJ 10 Installation sequence Installing the internal unit cont 5623 661 GB Installation ...
Страница 28: ...28 X20 2x 16 17 2x 12 14 18 13 15 Installation sequence Installing the internal unit cont 5623 661 GB ...
Страница 29: ...29 2x 4x 4x 6x 21 19 20 22 Installation sequence Installing the internal unit cont 5623 661 GB Installation ...
Страница 32: ...32 Installation sequence Installing the internal unit cont 5623 661 GB ...
Страница 95: ...95 Removing cover from programming unit if necessary 5 4 4x Troubleshooting Repairs cont 5623 661 GB Service ...
Страница 110: ...110 0003 0006 0005 0008 0007 0001 0009 0010 0002 0004 Parts lists internal unit Internal unit casing cont 5623 661 GB ...