82
2.
!
Please note
Excessive air pressure from
the front and sides can result
in the deformation of the alu-
minium fins of the heat
exchanger.
Only point the compressed air
gun at the heat exchanger
from the front and at an ade-
quate distance.
Blow out the heat exchanger
from
the inside out
with compressed air.
3.
Check the aluminium fins of the heat
exchanger for deformation and
scratches; if necessary, repair with a
suitable tool (e.g. fin comb).
4.
Close the casing of the external unit.
Checking electrical connections of the external unit for firm seat-
ing
Danger
Contact with 'live' components
can result in severe injuries.
Capacitors remain 'live' after the
power supply has been switched
OFF.
Wait at least 4 min, until the
capacitors have discharged,
before starting work on the exter-
nal unit.
Commissioning, inspection, maintenance
Further details regarding the individual steps
(cont.)
5623 661 GB
Содержание Vitocal 242-S
Страница 26: ...26 6 8 P301 P501 P303 P302 X25 F23 F6 7 Installation sequence Installing the internal unit cont 5623 661 GB ...
Страница 27: ...27 SLP N 9 11 aCH sG lJ 10 Installation sequence Installing the internal unit cont 5623 661 GB Installation ...
Страница 28: ...28 X20 2x 16 17 2x 12 14 18 13 15 Installation sequence Installing the internal unit cont 5623 661 GB ...
Страница 29: ...29 2x 4x 4x 6x 21 19 20 22 Installation sequence Installing the internal unit cont 5623 661 GB Installation ...
Страница 32: ...32 Installation sequence Installing the internal unit cont 5623 661 GB ...
Страница 95: ...95 Removing cover from programming unit if necessary 5 4 4x Troubleshooting Repairs cont 5623 661 GB Service ...
Страница 110: ...110 0003 0006 0005 0008 0007 0001 0009 0010 0002 0004 Parts lists internal unit Internal unit casing cont 5623 661 GB ...