37
1.
2.
3.
2x
C
Liquid line
D
Hot gas line
!
Please note
Contamination (e.g. metal swarf)
or moisture must not enter the
copper pipes.
Therefore, hold the pipe open-
ings downwards or temporarily
plug them.
Note
■ The refrigerant lines of the internal unit
are filled with nitrogen, overpressure
2 bar.
■ If using Euro flanged adaptors, solder
the connections using shielding gas.
Installation sequence
Connecting refrigerant lines
(cont.)
5623 661 GB
Installation
Содержание Vitocal 242-S
Страница 26: ...26 6 8 P301 P501 P303 P302 X25 F23 F6 7 Installation sequence Installing the internal unit cont 5623 661 GB ...
Страница 27: ...27 SLP N 9 11 aCH sG lJ 10 Installation sequence Installing the internal unit cont 5623 661 GB Installation ...
Страница 28: ...28 X20 2x 16 17 2x 12 14 18 13 15 Installation sequence Installing the internal unit cont 5623 661 GB ...
Страница 29: ...29 2x 4x 4x 6x 21 19 20 22 Installation sequence Installing the internal unit cont 5623 661 GB Installation ...
Страница 32: ...32 Installation sequence Installing the internal unit cont 5623 661 GB ...
Страница 95: ...95 Removing cover from programming unit if necessary 5 4 4x Troubleshooting Repairs cont 5623 661 GB Service ...
Страница 110: ...110 0003 0006 0005 0008 0007 0001 0009 0010 0002 0004 Parts lists internal unit Internal unit casing cont 5623 661 GB ...