Transport, storage and siting
18
Installation instructions
VITOBLOC 200 EM-530/660
version
SCR
58
41436
GB
The plant room must meet the following requirements:
G
G
ZL
GAS
AL
KO
AGA
Plan view
AL
KO
H
I
D
C
A
B
F
1
m
AGA
AL
GAS
HV
KO
ZL
HR
KO
Sectional view
E
K
GKV/GKR
GKV/GKR
AGA
Exhaust gas
HR
Heating water return
AL
Extract air
HV
Heating water flow
GAS
Natural gas
GKR Mixture coolant return
ZL
Supply air
GKV Mixture coolant flow
KO
Condensate drain
Fig. 5
Minimum clearances in the plant room
Note
A
2000 mm
Not installed
B
2000 mm
Recommendation
C
8000 mm
D
4850 mm
E
2070 mm
F
3800 mm
G
1500 mm
Not installed
H
1650 mm
I
4650 mm
K
1500 mm
Not installed
Tab. 1
Plant room dimensions
Designation
L x W x H [mm]
AdBlue™ supply tank
(e.g. 1000 litres IBC)
1200 x 1200 x 1200
Air compressor;
not required if there is a
compressed air supply on
site
500 x 500 x 500
Exhaust gas heat
exchanger, horizontal
3100 x 1000 x 1000
Exhaust gas heat
exchanger, vertical
1000 x 1000 x 3100
Tab. 2
Space required for additional components
(guide values; actual sizing may differ)
The CHP unit may only be positioned in the plant
room suspended from a crane with ropes attached to
the transport eyes or with suitable transport
equipment, such as a forklift or pallet truck.
WARNING
Heavy loads, risk of tipping over!
Falling loads can cause death or
serious injury
NEVER stand under suspended loads.
Use appropriate lifting gear.
Observe all transport instructions.