55
Commissioning steps
Inspection steps
Maintenance steps
Page
•
•
•
................................................................................................ 57
•
•
3. Filling the trap on the gas condensing module with water
............................................ 58
•
4. Filling the fuel cell module trap
........................................................................................ 59
•
................................................................................................. 60
•
•
•
•
................................................................................................. 62
•
8. Filling gas condensing module and heating circuits
...................................................... 62
•
............................................................................................... 65
•
10. Filling system separation circuit fuel cell module
.......................................................... 68
•
•
•
11. Checking all connections on the heating water and DHW sides for leaks
•
12. Setting max. heating output (gas condensing module)
................................................. 69
•
13. Naming the heating circuits
.............................................................................................. 69
•
14. Entering heating contractor contact details
.................................................................... 69
•
•
•
15. Measuring connection pressure (flow pressure)
........................................................... 69
•
•
•
16. Function sequence and possible faults (gas condensing module)
.............................. 71
•
17. Fuel cell module commissioning
...................................................................................... 72
•
.............................................................................................. 72
•
19. Converting the gas type on the fuel cell module
............................................................ 73
•
20. Adjusting parameters for the mains monitor (ENS) (country setting)
•
•
21. Filling with distilled water and starting the system
........................................................ 74
•
•
22. Terminating maintenance mode and activating energy manager
................................. 76
•
•
23. Tightness test on balanced flue system (annular gap check)
....................................... 76
•
24. Burner removal (gas condensing module)
...................................................................... 77
•
•
25. Checking the burner gasket and burner gauze assembly (gas condensing module)
•
26. Checking the back draught safety device
........................................................................ 79
•
27. Checking and adjusting ignition and ionisation electrode (gas condensing module)
•
28. Cleaning heating surfaces (gas condensing module)
.................................................... 80
•
•
29. Checking condensate drain and cleaning the trap (gas condensing module)
•
•
30. Fitting the burner (gas condensing module)
................................................................... 82
•
31. Checking the neutralising system (if installed)
•
32. 5-yearly maintenance of fuel cell module
........................................................................ 82
•
33. 10-yearly maintenance of fuel cell module
...................................................................... 84
•
34. Filling and venting the heating system after maintenance work
................................... 84
•
35. Checking the diaphragm expansion vessel and pressure in the system separation
•
•
36. Checking the external diaphragm expansion vessel (heating circuits) and system
•
•
•
37. Checking the safety valve function
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
5853335