Operator’s Manual Victory BX42S
- Page 26 of 51 -
Version 2.0
4.1.2
Install the PTO shaft
◼
Fit the PTO shaft between the tractor and implement. Watch the position of the shear bolt.
◼
Raise and lower the implement to find the maximum extended PTO shaft length. Check to
ensure that the PTO s
haft’s overall length does not exceed the
full recorded size.
◼
If needed, set the tractor’s 3
-Point lift height to keep the PTO shaft from exceeding the
maximum allowable length.
NOTE:
Attacht the one end with the
shear bolt to the woodchipper.
◼
Secure the chain to the tractor and
implement. This will prevent the
shield from spinning during
operation.
4.1.3
Checking the PTO Shaft’s Interference
Maximum PTO Shaft movement.
◼
Slowly engage the tractor’s hydraulic 3
-Point hitch to lower the implement while checking for
sufficient drawbar clearance. Move the drawbar ahead, aside, or remove it if required.
◼
Set the tractor’s 3
-Point hitch lift height to keep the PTO shaft from exceeding the maximum
allowable length and 25° up or down.