TABLE OF CONTENTS
1 Important Safety Instructions
2.2 Integrated Rack Characteristics
2.3 Vertiv VRC Characteristics
2.4 Liebert® GXT5 characteristics
2.5 Vertiv™ VRC-S System Connections
3 Equipment Inspection and Handling
3.1 Storing for Delayed Installation
3.2 Handling the Packaged Shipment
4.1 Prepare the Rack to Receive the Rack Cooling Unit (Vertiv™ VRC-S Self-Contained)
4.2 Install the Vertiv™ VRC (Vertiv™ VRC-S with Vertiv VRC Self-Contained)
4.3 Attach Air Baffles (Vertiv VRC-S with VRC self-contained)
4.4 Prepare the Rack to Receive the Rack Cooling Unit (Vertiv VRC-S with VCR Split)
4.5 Install the Vertiv (Vertiv VRC-S with Vertiv VRC Split)
4.6 Connect Power to the Backup Fan
4.7 Connect Power to the Condensate Pump
4.8.1 Route Display, Fan Cables
4.9 Connect the Vertiv™ VRC to the Geist™ rPDU
4.10 Attach Ductwork and Ceiling Tile (Vertiv™ VRC Self-Contained)
4.11 Install IT Equipment and Final Preparation
5.1 Initial Startup—Vertiv™ Services
5.2.1 Recommended Startup Sequence
5.3.1 Changing Settings with the Geist rPDU
5.3.2 Set up Connection between Geist™ rPDU and Liebert® GXT5
6.1 Troubleshooting the Vertiv™ VRC
6.2 Troubleshooting the Liebert® GXT5
6.2.1 Symptoms that Require Troubleshooting
iii
Vertiv™| VRC-S User Manual
Содержание VRC-S
Страница 1: ...VRC S User Manual...
Страница 10: ...1 Important Safety Instructions 6 This page intentionally left blank Vertiv VRC S User Manual...
Страница 20: ...2 Introduction 16 This page intentionally left blank Vertiv VRC S User Manual...
Страница 38: ...5 Operation 34 This page intentionally left blank Vertiv VRC S User Manual...
Страница 64: ...9 Appendices 60 This page intentionally left blank Vertiv VRC S User Manual...
Страница 65: ...Vertiv VRC S User Manual...