8
Check the LEDs on each disk drive carrier.
The following table describes the disk drive carrier LEDs. Note that the
combination of both LEDs provides the status.
Fault (amber) LED
Activity (green) LED
Status
Off
Off
No disk drive installed.
Off
Blinks during I/O activity
and during startup.
Drives are installed, turned
on, and operational.
Blinks at a rate of one
second on and one second
off.
On
Device identity.
On
Off
Drive slot fault.
On
On
Drive fault. Power control
circuit fault.
Blinks at a rate of one
second on and one second
off.
On
Possible drive fault.
9
Repeat these steps for each storage shelf. Let each shelf initialize before you
turn on the next shelf. Initialization should take 2 minutes to 3 minutes.
10
When all of the storage shelves are operational, turn on the appliance.
55
Installation procedures
Turning on the hardware and verifying operation
Содержание NetBackup 5240
Страница 1: ...NetBackup Appliance Hardware Installation Guide Release 2 7 3 NetBackup 5240 Document Revision 1 ...
Страница 4: ......
Страница 22: ...Preinstallation requirements Prerequisites for IPMI configuration 22 ...
Страница 42: ...Installation procedures Connecting a 4TB appliance to more than one storage shelf 42 ...
Страница 43: ...43 Installation procedures Connecting a 4TB appliance to more than one storage shelf ...
Страница 66: ...Installation procedures Accessing and using the Veritas Remote Management interface 66 ...
Страница 140: ...Adding storage shelves to an operating 4TB appliance that has at least one storage shelf attached Recabling 140 ...