3
Connect one cable to one PDU strip that is next to one power connector on
the storage shelf.
4
Connect the other cable to the other PDU strip that is next to the other power
connector on the storage shelf.
Turning on the hardware and verifying operation
The appliance and the storage shelves must be turned on in a specified order. If
the hardware is not turned on correctly the appliance RAID controller may not
recognize some storage units.
115
Adding one or more storage shelves to an operating 4TB appliance that does not have any storage shelves
Turning on the hardware and verifying operation
Содержание NetBackup 5240
Страница 1: ...NetBackup Appliance Hardware Installation Guide Release 2 7 3 NetBackup 5240 Document Revision 1 ...
Страница 4: ......
Страница 22: ...Preinstallation requirements Prerequisites for IPMI configuration 22 ...
Страница 42: ...Installation procedures Connecting a 4TB appliance to more than one storage shelf 42 ...
Страница 43: ...43 Installation procedures Connecting a 4TB appliance to more than one storage shelf ...
Страница 66: ...Installation procedures Accessing and using the Veritas Remote Management interface 66 ...
Страница 140: ...Adding storage shelves to an operating 4TB appliance that has at least one storage shelf attached Recabling 140 ...