15
Connect port B the bottom I/O module of the second shelf to port A in the
bottom I/O module in the first shelf.
16
Be sure that the blue clips on these connectors point up.
Next, connect network and power cables. Turn on the storage shelves and the
appliance per the required sequence. Verify that all units are functioning correctly.
Connecting the network cables
The networking ports are accessed on the rear panel of the device. The remote
management port is for use by Veritas Technical Support staff or by approved field
113
Adding one or more storage shelves to an operating 4TB appliance that does not have any storage shelves
Connecting the network cables
Содержание NetBackup 5240
Страница 1: ...NetBackup Appliance Hardware Installation Guide Release 2 7 3 NetBackup 5240 Document Revision 1 ...
Страница 4: ......
Страница 22: ...Preinstallation requirements Prerequisites for IPMI configuration 22 ...
Страница 42: ...Installation procedures Connecting a 4TB appliance to more than one storage shelf 42 ...
Страница 43: ...43 Installation procedures Connecting a 4TB appliance to more than one storage shelf ...
Страница 66: ...Installation procedures Accessing and using the Veritas Remote Management interface 66 ...
Страница 140: ...Adding storage shelves to an operating 4TB appliance that has at least one storage shelf attached Recabling 140 ...