3
Place one rail inside the rack.
■
The rack holes and the rail pins should match the template.
■
Use the same 1RU space and holes in the front and the rear of the rack.
■
Align the pins in the top holes and the bottom holes of the top RU.
■
Move the rail front and back to fit into the rack.
■
Slide the rail forward until the pins click into the rack holes.
4
Secure the rear of the rail.
■
Push the blue lock toward the rack wall and toward the back of the rail.
■
The lock must be behind the rack post.
■
Ensure that the lock clicks into place.
Installation procedures
Installing the appliance rack rails
28
Содержание NetBackup 5240
Страница 1: ...NetBackup Appliance Hardware Installation Guide Release 2 7 3 NetBackup 5240 Document Revision 1 ...
Страница 4: ......
Страница 22: ...Preinstallation requirements Prerequisites for IPMI configuration 22 ...
Страница 42: ...Installation procedures Connecting a 4TB appliance to more than one storage shelf 42 ...
Страница 43: ...43 Installation procedures Connecting a 4TB appliance to more than one storage shelf ...
Страница 66: ...Installation procedures Accessing and using the Veritas Remote Management interface 66 ...
Страница 140: ...Adding storage shelves to an operating 4TB appliance that has at least one storage shelf attached Recabling 140 ...