Shrink Tunnel VC999 ST2/ST2 D
Index
2009-11-12
Art. no. 593.767
Page 95/96
17 Index
A
Access cover 28
Access rights 40
Alarm list 39, 46
Analog value 49
Authorized person 40
Automatic decalcification 51
Automatic warm-up 51
Autostart 50
Autostarts 39
B
Background colors 38
Bar handle 16
Belt cartridge 16, 17, 21
C
Cancelling production 60
Changing the program 61
Changing the standard decalcifier canister
(optional) 76
Checking the belt tension 74
Checks 74
Circuit diagrams 81
Cleaning 69
Cleaning agent 69
Cleaning the belt cartridge and sieve 72
Cleaning the machine 32
Cleaning the steam supply line filter sieve 71
Cleaning the water supply line filter sieve 71
Cleaning work 70
Continuous operation 61
Control panel 16, 36
Controller 23
Customer Service 9
D
Decalcification 39, 63
Decalcification mode 61
Decalcification processes 61
Decalcifying system (optional) 16, 22, 57
Decommissioning 80
Defect mode 57
Dimensions 20
Display 36
Disposal 80
Drive motors 22
E
Electric cabinet 16, 18, 28
Electric heater 17
Electrical connection 27
Electrical data 22
Electrical installation 28
EMERGENCY OFF button 36
EMERGENCY STOP 62
EMERGENCY STOP button 16
Emptying 63
Emptying the water tank 54
Error messages 66
F
Fill decalcifier 53, 63
Filter sieve 29
Frequency converter 58
Further functions 57
H
Handover Declaration 3
Hazardous substances 80
Heater 16
HEATER lamp 37
Hold temperature 56
I
Infeed belt 43
Infeed roller conveyor 16, 18
Info text 58, 63
Information 48
Initial start-up 33
Input fields 38
Inputs 59
Inputs / Outputs 59
Installation check 33
Installation of the machine 28
Installation of the protective rollers 32
Installation of the steam supply line (VC999
ST2 D) 31
Installation of the water discharge 30
Installation of the water supply line 29
Installation the steam extraction system 31
Intended use 13
Internal conveyor belt 43
L
Language 56
Leveling the machine 26
Loading program 44
LOG IN 39, 47
LOG OUT 39, 48
M
Machine connections 27
Machine data 55
Machine not ready for operation 63
Machine settings 39, 55
Machine status 48
Main menu page 1 42
Main menu page 2 47
Main menu page 3 50
Main menu page 4 55
Main switch 16, 34
Maintenance 69
Maintenance work 75
Malfunctions 63
Manual decalcification 53
Menu 39
N
Name plate 16, 28, 79
Noise emission 23
Normal switching on 37
O
Operating hours meter 39, 45
Operating messages 63
Содержание 593.767
Страница 4: ......
Страница 41: ...Shrink Tunnel VC999 ST2 ST2 D Operation 2009 11 12 Art no 593 767 Page 41 96 Fig 9 3...
Страница 81: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams 2009 11 12 Art no 593 767 Page 81 96 16 Circuit diagrams...
Страница 82: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams Page 82 96 Art no 593 767 2009 11 12...
Страница 83: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams 2009 11 12 Art no 593 767 Page 83 96...
Страница 84: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams Page 84 96 Art no 593 767 2009 11 12...
Страница 85: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams 2009 11 12 Art no 593 767 Page 85 96...
Страница 86: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams Page 86 96 Art no 593 767 2009 11 12...
Страница 87: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams 2009 11 12 Art no 593 767 Page 87 96...
Страница 88: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams Page 88 96 Art no 593 767 2009 11 12...
Страница 89: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams 2009 11 12 Art no 593 767 Page 89 96...
Страница 90: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams Page 90 96 Art no 593 767 2009 11 12...
Страница 91: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams 2009 11 12 Art no 593 767 Page 91 96...
Страница 92: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams Page 92 96 Art no 593 767 2009 11 12...
Страница 93: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams 2009 11 12 Art no 593 767 Page 93 96...
Страница 94: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams Page 94 96 Art no 593 767 2009 11 12...