Shrink Tunnel VC999 ST2/ST2 D
Operation
2009-11-12
Art. no. 593.767
Page 51/96
9.6.1.1 Automatic
warm-up
Use this mask to program the automatic warm-up of the spray
water according to the weekday and switch-on time. The warm-
up time is approx. 20-30 minutes.
Automatic decalcification (optional)
Fig. 9/26
The arrow buttons are only displayed when the machine is equipped with a decalcifying system (op-
tional) and the function "Decalcification pump" is switched on in the machine settings.
Programming
•
In the "Autostart" menu, press the clock and then enter the desired switch-on time.
•
Press the desired day(s) on which automatic warm-up should occur. The field of a selected day is
displayed inverted.
NOTICE
Only the spray water is warmed up during automatic warm-up. Production is not started.
9.6.1.2 Automatic
decalcification (optional)
NOTICE
The function can only be programmed when the machine is equipped with a decalcifying sys-
tem (optional) and the function "Decalcification pump" has been switched on in the machine
settings.
Use this mask to program automatic decalcification of the water
tank and supply lines according to the weekday and switch-on
time. The decalcification process lasts approx. 30-40 minutes.
See the section "Decalcification mode" for more information
about the decalcification process.
Automatic warm-up
Fig. 9/27
Programming
•
In the "Automatic decalcification" menu, press the time and then enter the desired start time for the
decalcification process.
•
Press the desired day on which the decalcification process should be automatically started. The
field of the selected day is displayed inverted.
Содержание 593.767
Страница 4: ......
Страница 41: ...Shrink Tunnel VC999 ST2 ST2 D Operation 2009 11 12 Art no 593 767 Page 41 96 Fig 9 3...
Страница 81: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams 2009 11 12 Art no 593 767 Page 81 96 16 Circuit diagrams...
Страница 82: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams Page 82 96 Art no 593 767 2009 11 12...
Страница 83: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams 2009 11 12 Art no 593 767 Page 83 96...
Страница 84: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams Page 84 96 Art no 593 767 2009 11 12...
Страница 85: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams 2009 11 12 Art no 593 767 Page 85 96...
Страница 86: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams Page 86 96 Art no 593 767 2009 11 12...
Страница 87: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams 2009 11 12 Art no 593 767 Page 87 96...
Страница 88: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams Page 88 96 Art no 593 767 2009 11 12...
Страница 89: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams 2009 11 12 Art no 593 767 Page 89 96...
Страница 90: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams Page 90 96 Art no 593 767 2009 11 12...
Страница 91: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams 2009 11 12 Art no 593 767 Page 91 96...
Страница 92: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams Page 92 96 Art no 593 767 2009 11 12...
Страница 93: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams 2009 11 12 Art no 593 767 Page 93 96...
Страница 94: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams Page 94 96 Art no 593 767 2009 11 12...