Subject to modification!
Updated 10/2017
75
G
ener
al
O
p
er
atio
n
Inst
all
atio
n
O
p
er
atio
n
(
S
e
rvi
ce
)
Ma
int
enan
c
e
Figure 14: Current sensor - direction of installation
When installing the current sensor, it is important that the sensor
board points in the direction of the sub-distribution (see Figure 14:
Current sensor - direction of installation). Conductors L1, L2, L3 for
building connection, current sensor and AC connector must have
the same phase assignment.
Current sensor and energy storage system are connected with the
supplied sensor cable. See position of socket "current
measurement " in Figure 16.
For the connection diagram, see Figures 1a and 1b, and also
2a and 2b in the Annex.
Содержание element Series
Страница 1: ...Subject to modification Updated 10 2017 Version 09 INSTRUCTION MANUAL VARTA element VARTA Storage GmbH...
Страница 28: ...28 Subject to modification Updated 10 2017 3 3 Front view VARTA element Figure 1 Front view VARTA element...
Страница 62: ...62 Subject to modification Updated 10 2017 Details of the commissioning report...