WARNING
Improper installation!
Personal injury and material damage
Design the fuse ahead of the energy
storage system with three poles!
It must fulfil the requirements of a
separator.
Fuse the device connection at the
energy storage system with a 16 A fuse
type B.
Observe the disconnect conditions in
accordance with VDE 0100-410.
Never connect the energy storage
system without a PE and N connection!
A suitable separator must be installed
between power grid and customer
system (e.g. selective automatic cut-out
'SAC'), which can be used for all-poles
disconnection of the customer system
from the grid during maintenance work.
Observe the specified conductor cross-
sections!
For the position of the separators, see the connection
diagrams (Figures 1a/1b and 2a/2b) in the Appendix.
Содержание element Series
Страница 1: ...Subject to modification Updated 10 2017 Version 09 INSTRUCTION MANUAL VARTA element VARTA Storage GmbH...
Страница 28: ...28 Subject to modification Updated 10 2017 3 3 Front view VARTA element Figure 1 Front view VARTA element...
Страница 62: ...62 Subject to modification Updated 10 2017 Details of the commissioning report...