Subject to modification!
Updated 10/2017
121
G
ener
al
O
p
er
atio
n
Inst
all
atio
n
O
p
er
atio
n
(
S
e
rvi
ce
)
Ma
int
enan
c
e
Table 14: Setting as per Q(P) characteristic
Time delay:
Enter the time in s, after which the reactive
power is to be adjusted.
Minimum power:
Enter the minimum power in %, up to
which the reactive current is not controlled.
Setting as per Q(U) characteristic
Reactive power function:
Select
Q(U) characteristic
from
the drop-down list.
QUX1 to QUX4:
Enter the settings for QUX1 to QUX4 by
using the numerical input fields. You can find the settings in
Figure 28.
QUY1 to QUY4:
Enter the settings for QUY1 to QUY4 by
using the numerical input fields. You can find the settings
in Table 15.
Содержание element Series
Страница 1: ...Subject to modification Updated 10 2017 Version 09 INSTRUCTION MANUAL VARTA element VARTA Storage GmbH...
Страница 28: ...28 Subject to modification Updated 10 2017 3 3 Front view VARTA element Figure 1 Front view VARTA element...
Страница 62: ...62 Subject to modification Updated 10 2017 Details of the commissioning report...