70
Subject to modification!
Updated 10/2017
8.6.1
Connections to the distributor box
The following connections must be prepared:
Device connection: 5 x 1.5 - 2.5 mm²
Sensor cable: RJ12
LAN connection
i
1. Do not allow any mechanical load on the
sensor cable.
2. In order to minimise losses, the wiring
section between storage and connection
should not be longer than 20 m.
Содержание element Series
Страница 1: ...Subject to modification Updated 10 2017 Version 09 INSTRUCTION MANUAL VARTA element VARTA Storage GmbH...
Страница 28: ...28 Subject to modification Updated 10 2017 3 3 Front view VARTA element Figure 1 Front view VARTA element...
Страница 62: ...62 Subject to modification Updated 10 2017 Details of the commissioning report...