Post-Impact Instructions
Important:
Valtir makes no recommendation whether use or reuse of any
part of the system is appropriate or acceptable following an impact. It is the
sole responsibility of the local highway authority and its engineers to make
that determination. It is critical that you inspect this product after assembly
is complete to make certain that the instructions provided in this manual
have been strictly followed.
1) Deploy appropriate traffic-control devices.
2) Ensure all anchor bolts have remained firmly anchored in the roadway surface. Replace
any loose, broken, or pulled out anchors.
The performance of the system during an angle impact depends on a properly
anchored Monorail.
3) Clear and dispose of any debris on site.
4) Ensure the Mushroom Washer Assemblies are intact so the system can be restored to its
original position.
Caution:
Use eye protection and gloves when refurbishing the Mushroom
Washer Die Spring Assembly. Do not place fingers underneath an assembled
Mushroom Washer. Parts may suddenly shift and fingers may be pinched. If the
Die Spring is still under compression as the nut is nearing the end of the bolt, to
prevent injury make sure that the Die Spring is restrained with a clamp so it does
not suddenly release when the nut is removed from the Mushroom Washer Bolt.
5) The Diaphragm Support Legs are all properly attached to the Monorail.
6) Remove the Nose Assembly and attach a chain to the Pullout Brackets on the first
Diaphragm (Figure 35). Attach both ends of chain to a heavy vehicle (such as a 1 ton
pickup).
Warning:
Stand clear in case chain breaks or becomes disconnected.
Figure 35
Pullout Brackets
Important:
Slowly pull the system forward to its original length. Have someone
watch the repositioning to ensure undetected damage does not cause the
Diaphragms to bind or pull out improperly.
Содержание QuadGuard M10
Страница 1: ......
Страница 41: ...Valtir com 40 Revision F August 2022 QuadGuard M10 w Tension Strut Backup QGMTSCVR U...
Страница 42: ...Valtir com 41 Revision F August 2022 TS Concrete Pad 618686...
Страница 43: ...Valtir com 42 Revision F August 2022 TS Concrete Pad 8 w Rebar 618686...
Страница 44: ...Valtir com 43 Revision F August 2022 TS Concrete Pad 8 wo Rebar 618686...
Страница 45: ...Valtir com 44 Revision F August 2022 Tension Strut Backup 627448...
Страница 46: ...Valtir com 45 Revision F August 2022 Monorail Assembly 625637...
Страница 47: ...Valtir com 46 Revision F August 2022 Diaphragm Assembly 625650...
Страница 48: ...Valtir com 47 Revision F August 2022 Shim Kit 627518...
Страница 49: ...Valtir com 48 Revision F August 2022 Fender Panel Assembly 608236...
Страница 50: ...Valtir com 49 Revision F August 2022 Nose Assembly 626814...
Страница 51: ...Valtir com 50 Revision F August 2022 31 W Beam Guardrail Transition QGMTSCVR TWLR...
Страница 52: ...Valtir com 51 Revision F August 2022 Thrie Beam Guardrail Transition QGMTSCVR TTLR...
Страница 53: ...Valtir com 52 Revision F August 2022 Safety Shape Barrier Transition QGMTSCVR T4...
Страница 54: ...Valtir com 53 Revision F August 2022 Single Slope Transition QGMTSCVR T6...
Страница 55: ...Valtir com 54 Revision F August 2022 Vertical Barrier Transition QGMTSCVR ES...
Страница 56: ...Valtir com 55 Revision F August 2022 Vertical Barrier Transition Extended QGMTSCVR SPE...
Страница 57: ...Valtir com 56 Revision F August 2022 NOTES...
Страница 58: ...Valtir com 57 Revision F August 2022 NOTES...
Страница 59: ...Valtir com 58 Revision F August 2022 NOTES...
Страница 60: ......