Shift Times/Setback Times
Programming Shifts
Three shifts can be programmed into the unit. Start shift, end shift, and setback times can be pre-programmed for
each shift to reduce downtime. Make certain all desired temperatures are set first (see Programming Temperatures,
this section).
First program the time the heaters will be on, off, and in setback for each of the three shifts. Use the Right/Left Arrow
Buttons to move through the times and shifts and the OK Button to get a thumbwheel to set the times and turn on the
setback feature with a “switch” on the thumbwheel. (The heaters can be set with or without using the setback times.)
Set the start, stop, and setback times for all shifts. Leave the unused shifts/times blank (— —).
This screen states that for Shift A, heaters will turn on at 7:00 AM to the setpoint temperatures (set on the
Temperature Screens, previously shown) and off at 3:00 PM, with all heaters going to the setback temperatures from
11:30 AM to 12:00 PM.
This screen states that for Shift C, nothing will be on, since there is no Shift C working.
After setting all shift times, program the shifts that will be enabled for each day of the week. The Up/Down Arrow
Buttons cycle through the different combinations of shifts, and the Left/Right Arrow Buttons cycle through the days of
the week.
From this screen, use the Up/Down Buttons
and the Right/Left Buttons to go through
and adjust the shifts and setback times as
desired. See the next page for an in-depth
review.
Содержание D4
Страница 1: ...D4 Hot Melt Unit Manual Number MM147 Revision Date 6 2018 ...
Страница 4: ......
Страница 10: ...Table of Contents MM147 D4 Hot Melt Unit 10 Module Status LED 170 Link Activity LED 170 ...
Страница 20: ...Section 2 Safety and Use MM147 D4 Hot Melt Unit 20 ...
Страница 22: ...Section 3 Basic Features MM147 D4 Hot Melt Unit 22 ...
Страница 35: ...MM147 D4 Hot Melt Unit Section 5 Setup 35 Section 5 Setup Control Panel ...
Страница 42: ...Section 5 Setup MM147 D4 Hot Melt Unit 42 Set Language Continued Next Page ...
Страница 43: ...MM147 D4 Hot Melt Unit Section 5 Setup 43 Set Language Continued ...
Страница 44: ...Section 5 Setup MM147 D4 Hot Melt Unit 44 Set Temperature Units ...
Страница 46: ...Section 5 Setup MM147 D4 Hot Melt Unit 46 Tank Temperature Hose Valve Temperature Continued Next Page ...
Страница 47: ...MM147 D4 Hot Melt Unit Section 5 Setup 47 Hose Valve Temperature Continued ...
Страница 54: ...Section 5 Setup MM147 D4 Hot Melt Unit 54 Beacon Alarm Setup Continued ...
Страница 55: ...MM147 D4 Hot Melt Unit Section 5 Setup 55 Beacon 2 ...
Страница 70: ...Section 5 Setup MM147 D4 Hot Melt Unit 70 Sequential Start Valve ...
Страница 100: ...Section 6 Operation MM147 D4 Hot Melt Unit 100 ...
Страница 106: ...Section 7 Maintenance MM147 D4 Hot Melt Unit 106 ...
Страница 110: ...Section 9 Specifications MM147 D4 Hot Melt Unit 110 Dimensions ...
Страница 112: ...Section 10 Part Number List MM147 D4 Hot Melt Unit 112 D4 Unit ...
Страница 113: ...MM147 D4 Hot Melt Unit Section 10 Part Number List 113 D4 Unit Continued ...
Страница 120: ...Section 10 Part Number List MM147 D4 Hot Melt Unit 120 D4 Base Unit 776xx392 ...
Страница 142: ...Section 11 Warranty MM147 D4 Hot Melt Unit 142 ...
Страница 144: ...Section 12 Service MM147 D4 Hot Melt Unit 144 ...
Страница 146: ...Appendix A Password Levels MM147 D4 Hot Melt Unit 146 Setting Level 0 as Default Continued ...
Страница 148: ...Appendix B Power Requirements MM147 D4 Hot Melt Unit 148 ...
Страница 150: ...Appendix C Instruction Sheets for Option Kits MM147 D4 Hot Melt Unit 150 ...
Страница 208: ...5 Valco Melton IS0343 Anybus Installation Installation Continued ...
Страница 245: ...Appendix E Communication Protocols Modus MM147 D4 Hot Melt Unit 162 ...