MM147 - D4 Hot Melt Unit
Section 6 - Operation
97
Setback
The Setback Temperatures are pre-programmed (see “Setback Temperatures”, Section 5 - Setup). When setback
times are set (See “Clock - Shift Times/Setback Times,” Section 5 - Setup) and the clock is on, the unit automatically
enters setback during each shift as programmed. If, however, an unscheduled break occurs, the Setback Button can
be pressed (Setback LED illuminated yellow) to put the unit into setback manually. To exit setback mode, press the
Setback Button again (LED not illuminated). The setback time and temperature can be set manually by using the
arrow navigation keys to access the temperature and time set screens and entering values on these screens (see
Section 5 - Setup).
Automatic Setback
Automatic setback can be programmed through one of the remote inputs from the input screen. When an input is set
for Auto Setback, AND the Auto Setback Timeout is enabled, the control will AUTOMATICALLY go into set back if the
input has not been triggered for the timeout set by the user.
For instance, if a valve fire signal is connected to Input #2, Input #2 is programmed for Auto. Setback and the Auto
Setback Timeout is enabled and set for 30 minutes, the control will automatically go into set back if the valve has not
been fired for 30 minutes. Each valve fire within that 30 minute time period will reset the Timeout timer to start back at
30 minutes. The setback symbol will start to flash 2 minutes prior to the control going into setback.
Setback On/Off Key & LED
Содержание D4
Страница 1: ...D4 Hot Melt Unit Manual Number MM147 Revision Date 6 2018 ...
Страница 4: ......
Страница 10: ...Table of Contents MM147 D4 Hot Melt Unit 10 Module Status LED 170 Link Activity LED 170 ...
Страница 20: ...Section 2 Safety and Use MM147 D4 Hot Melt Unit 20 ...
Страница 22: ...Section 3 Basic Features MM147 D4 Hot Melt Unit 22 ...
Страница 35: ...MM147 D4 Hot Melt Unit Section 5 Setup 35 Section 5 Setup Control Panel ...
Страница 42: ...Section 5 Setup MM147 D4 Hot Melt Unit 42 Set Language Continued Next Page ...
Страница 43: ...MM147 D4 Hot Melt Unit Section 5 Setup 43 Set Language Continued ...
Страница 44: ...Section 5 Setup MM147 D4 Hot Melt Unit 44 Set Temperature Units ...
Страница 46: ...Section 5 Setup MM147 D4 Hot Melt Unit 46 Tank Temperature Hose Valve Temperature Continued Next Page ...
Страница 47: ...MM147 D4 Hot Melt Unit Section 5 Setup 47 Hose Valve Temperature Continued ...
Страница 54: ...Section 5 Setup MM147 D4 Hot Melt Unit 54 Beacon Alarm Setup Continued ...
Страница 55: ...MM147 D4 Hot Melt Unit Section 5 Setup 55 Beacon 2 ...
Страница 70: ...Section 5 Setup MM147 D4 Hot Melt Unit 70 Sequential Start Valve ...
Страница 100: ...Section 6 Operation MM147 D4 Hot Melt Unit 100 ...
Страница 106: ...Section 7 Maintenance MM147 D4 Hot Melt Unit 106 ...
Страница 110: ...Section 9 Specifications MM147 D4 Hot Melt Unit 110 Dimensions ...
Страница 112: ...Section 10 Part Number List MM147 D4 Hot Melt Unit 112 D4 Unit ...
Страница 113: ...MM147 D4 Hot Melt Unit Section 10 Part Number List 113 D4 Unit Continued ...
Страница 120: ...Section 10 Part Number List MM147 D4 Hot Melt Unit 120 D4 Base Unit 776xx392 ...
Страница 142: ...Section 11 Warranty MM147 D4 Hot Melt Unit 142 ...
Страница 144: ...Section 12 Service MM147 D4 Hot Melt Unit 144 ...
Страница 146: ...Appendix A Password Levels MM147 D4 Hot Melt Unit 146 Setting Level 0 as Default Continued ...
Страница 148: ...Appendix B Power Requirements MM147 D4 Hot Melt Unit 148 ...
Страница 150: ...Appendix C Instruction Sheets for Option Kits MM147 D4 Hot Melt Unit 150 ...
Страница 208: ...5 Valco Melton IS0343 Anybus Installation Installation Continued ...
Страница 245: ...Appendix E Communication Protocols Modus MM147 D4 Hot Melt Unit 162 ...