4
Valco Melton
IS0231
Vacuum Feeder Assembly Instructions
Installation - Continued
16. Route the side of the cable assembly with the terminal ring
through the center bulkhead.
17. Route the other end of the cable assembly through the open
knockout on the top of the case.
18. Remove the rectangular connector from the top of the air valve.
19. Remove wiring insert, using a small, flat-head screwdriver.
20. Route the cable assembly through the bottom of the connector.
21. Attach the three (3) ferrules to the connector by following the
labels on the wire ends.
22. Replace the wiring insert back into the connector. Make sure the
fiberglass sleeving is held by the strain relief in the bottom of the
connector.
23. Route the cable assembly through the cable clamp on the back
of the valve.
Содержание D4
Страница 1: ...D4 Hot Melt Unit Manual Number MM147 Revision Date 6 2018 ...
Страница 4: ......
Страница 10: ...Table of Contents MM147 D4 Hot Melt Unit 10 Module Status LED 170 Link Activity LED 170 ...
Страница 20: ...Section 2 Safety and Use MM147 D4 Hot Melt Unit 20 ...
Страница 22: ...Section 3 Basic Features MM147 D4 Hot Melt Unit 22 ...
Страница 35: ...MM147 D4 Hot Melt Unit Section 5 Setup 35 Section 5 Setup Control Panel ...
Страница 42: ...Section 5 Setup MM147 D4 Hot Melt Unit 42 Set Language Continued Next Page ...
Страница 43: ...MM147 D4 Hot Melt Unit Section 5 Setup 43 Set Language Continued ...
Страница 44: ...Section 5 Setup MM147 D4 Hot Melt Unit 44 Set Temperature Units ...
Страница 46: ...Section 5 Setup MM147 D4 Hot Melt Unit 46 Tank Temperature Hose Valve Temperature Continued Next Page ...
Страница 47: ...MM147 D4 Hot Melt Unit Section 5 Setup 47 Hose Valve Temperature Continued ...
Страница 54: ...Section 5 Setup MM147 D4 Hot Melt Unit 54 Beacon Alarm Setup Continued ...
Страница 55: ...MM147 D4 Hot Melt Unit Section 5 Setup 55 Beacon 2 ...
Страница 70: ...Section 5 Setup MM147 D4 Hot Melt Unit 70 Sequential Start Valve ...
Страница 100: ...Section 6 Operation MM147 D4 Hot Melt Unit 100 ...
Страница 106: ...Section 7 Maintenance MM147 D4 Hot Melt Unit 106 ...
Страница 110: ...Section 9 Specifications MM147 D4 Hot Melt Unit 110 Dimensions ...
Страница 112: ...Section 10 Part Number List MM147 D4 Hot Melt Unit 112 D4 Unit ...
Страница 113: ...MM147 D4 Hot Melt Unit Section 10 Part Number List 113 D4 Unit Continued ...
Страница 120: ...Section 10 Part Number List MM147 D4 Hot Melt Unit 120 D4 Base Unit 776xx392 ...
Страница 142: ...Section 11 Warranty MM147 D4 Hot Melt Unit 142 ...
Страница 144: ...Section 12 Service MM147 D4 Hot Melt Unit 144 ...
Страница 146: ...Appendix A Password Levels MM147 D4 Hot Melt Unit 146 Setting Level 0 as Default Continued ...
Страница 148: ...Appendix B Power Requirements MM147 D4 Hot Melt Unit 148 ...
Страница 150: ...Appendix C Instruction Sheets for Option Kits MM147 D4 Hot Melt Unit 150 ...
Страница 208: ...5 Valco Melton IS0343 Anybus Installation Installation Continued ...
Страница 245: ...Appendix E Communication Protocols Modus MM147 D4 Hot Melt Unit 162 ...