
IS0299 - D Series Coupling Upgrade Procedure
9
19. There should be some play in the spider after the coupling is assembled. Verify that the coupling can be
moved easily, by hand, approximately .020” (.50mm) in each direction shown in the figure below.
CAUTION!
If the spider does not have some play in the directions shown, the pump and motor shafts
may not be properly aligned, or there may not be sufficient axial clearance between the hubs
and the spider. Proceeding without correcting misalignment or axial clearance could cause
damage to the pump!
20. Turn the unit upright, reconnect power, and fill the tank with adhesive. Once the unit has reached
operating temperature and the adhesive has melted, start the pump. Verify that there is no noise from the
pump, and check the unit for vibration. If no abnormal conditions are observed, the unit is ready to be put
back in service.
© Valco Cincinnati, Inc.
www.valcomelton.com
IS0299
1/16
No part of this document may be reproduced without express permission from Valco Cincinnati, Inc. All rights
reserved. Designs and other information may change without notice.
Valco Cincinnati Incorporated
411 Circle Freeway Drive
Cincinnati, Ohio 45246, USA
TEL: (1) 513-874-6550
FAX: (1) 513-874-3612
Melton S.L.U.
Pol. Industrial Agustinos
calle G, n. 34
31160 Orcoyen, Navarra, Spain
TEL: (34) 948-321-580
FAX: (34) 948-326-584
Valco Cincinnati, Ltd.
Unit 7-8
Hortonwood 32
Telford TF1 7YN England
TEL: (44) 1952-677911
FAX: (44) 1952-677945
Valco Cincinnati GmbH
Bonnerstrasse 349
40589 Dusseldorf-Benrath,
Germany
Tel: +49 211 984 798-0
Fax: +49 211 984 798-20
Valco Melton France
Technoparc des Hautes Faventines
32 Rue Jean Bertin
26000 Valence
Tel: +33 (0)4 75 78 13 73
Fax: +33 (0)4 75 55 74 20
Содержание D4
Страница 1: ...D4 Hot Melt Unit Manual Number MM147 Revision Date 6 2018 ...
Страница 4: ......
Страница 10: ...Table of Contents MM147 D4 Hot Melt Unit 10 Module Status LED 170 Link Activity LED 170 ...
Страница 20: ...Section 2 Safety and Use MM147 D4 Hot Melt Unit 20 ...
Страница 22: ...Section 3 Basic Features MM147 D4 Hot Melt Unit 22 ...
Страница 35: ...MM147 D4 Hot Melt Unit Section 5 Setup 35 Section 5 Setup Control Panel ...
Страница 42: ...Section 5 Setup MM147 D4 Hot Melt Unit 42 Set Language Continued Next Page ...
Страница 43: ...MM147 D4 Hot Melt Unit Section 5 Setup 43 Set Language Continued ...
Страница 44: ...Section 5 Setup MM147 D4 Hot Melt Unit 44 Set Temperature Units ...
Страница 46: ...Section 5 Setup MM147 D4 Hot Melt Unit 46 Tank Temperature Hose Valve Temperature Continued Next Page ...
Страница 47: ...MM147 D4 Hot Melt Unit Section 5 Setup 47 Hose Valve Temperature Continued ...
Страница 54: ...Section 5 Setup MM147 D4 Hot Melt Unit 54 Beacon Alarm Setup Continued ...
Страница 55: ...MM147 D4 Hot Melt Unit Section 5 Setup 55 Beacon 2 ...
Страница 70: ...Section 5 Setup MM147 D4 Hot Melt Unit 70 Sequential Start Valve ...
Страница 100: ...Section 6 Operation MM147 D4 Hot Melt Unit 100 ...
Страница 106: ...Section 7 Maintenance MM147 D4 Hot Melt Unit 106 ...
Страница 110: ...Section 9 Specifications MM147 D4 Hot Melt Unit 110 Dimensions ...
Страница 112: ...Section 10 Part Number List MM147 D4 Hot Melt Unit 112 D4 Unit ...
Страница 113: ...MM147 D4 Hot Melt Unit Section 10 Part Number List 113 D4 Unit Continued ...
Страница 120: ...Section 10 Part Number List MM147 D4 Hot Melt Unit 120 D4 Base Unit 776xx392 ...
Страница 142: ...Section 11 Warranty MM147 D4 Hot Melt Unit 142 ...
Страница 144: ...Section 12 Service MM147 D4 Hot Melt Unit 144 ...
Страница 146: ...Appendix A Password Levels MM147 D4 Hot Melt Unit 146 Setting Level 0 as Default Continued ...
Страница 148: ...Appendix B Power Requirements MM147 D4 Hot Melt Unit 148 ...
Страница 150: ...Appendix C Instruction Sheets for Option Kits MM147 D4 Hot Melt Unit 150 ...
Страница 208: ...5 Valco Melton IS0343 Anybus Installation Installation Continued ...
Страница 245: ...Appendix E Communication Protocols Modus MM147 D4 Hot Melt Unit 162 ...