3
Valco Melton
IS0213
Pressure Switch Installation Instructions
Installing the Pressure Switch into
the Side of a Manifold - Continued
Calibrating the
Pressure Switch
1.
Route and secure the cable, to ensure that it will not be caught in
the motor, using two (2) ty-raps and two (2) wire harnesses.
2.
If the pressure switch is being hooked into the unit’s universal
control, route the cables through either the cord grip or the slot
into the electrical cabinet.
3.
Bundle any remaining wire.
4.
Open the front operator panel.
5.
Connect the flying leads from the pressure switch to the universal
control, as detailed below.
Wire Color
Function
Brown Common
Red N.C.
Blue N.O.
Green PE
6.
Connect the brown wire into “GND” for the desired input.
a.
If a pressure rise is desired, connect the blue wire to
the center pin.
b.
If a pressure drop is desired, connect the red wire to
the center pin.
Содержание D4
Страница 1: ...D4 Hot Melt Unit Manual Number MM147 Revision Date 6 2018 ...
Страница 4: ......
Страница 10: ...Table of Contents MM147 D4 Hot Melt Unit 10 Module Status LED 170 Link Activity LED 170 ...
Страница 20: ...Section 2 Safety and Use MM147 D4 Hot Melt Unit 20 ...
Страница 22: ...Section 3 Basic Features MM147 D4 Hot Melt Unit 22 ...
Страница 35: ...MM147 D4 Hot Melt Unit Section 5 Setup 35 Section 5 Setup Control Panel ...
Страница 42: ...Section 5 Setup MM147 D4 Hot Melt Unit 42 Set Language Continued Next Page ...
Страница 43: ...MM147 D4 Hot Melt Unit Section 5 Setup 43 Set Language Continued ...
Страница 44: ...Section 5 Setup MM147 D4 Hot Melt Unit 44 Set Temperature Units ...
Страница 46: ...Section 5 Setup MM147 D4 Hot Melt Unit 46 Tank Temperature Hose Valve Temperature Continued Next Page ...
Страница 47: ...MM147 D4 Hot Melt Unit Section 5 Setup 47 Hose Valve Temperature Continued ...
Страница 54: ...Section 5 Setup MM147 D4 Hot Melt Unit 54 Beacon Alarm Setup Continued ...
Страница 55: ...MM147 D4 Hot Melt Unit Section 5 Setup 55 Beacon 2 ...
Страница 70: ...Section 5 Setup MM147 D4 Hot Melt Unit 70 Sequential Start Valve ...
Страница 100: ...Section 6 Operation MM147 D4 Hot Melt Unit 100 ...
Страница 106: ...Section 7 Maintenance MM147 D4 Hot Melt Unit 106 ...
Страница 110: ...Section 9 Specifications MM147 D4 Hot Melt Unit 110 Dimensions ...
Страница 112: ...Section 10 Part Number List MM147 D4 Hot Melt Unit 112 D4 Unit ...
Страница 113: ...MM147 D4 Hot Melt Unit Section 10 Part Number List 113 D4 Unit Continued ...
Страница 120: ...Section 10 Part Number List MM147 D4 Hot Melt Unit 120 D4 Base Unit 776xx392 ...
Страница 142: ...Section 11 Warranty MM147 D4 Hot Melt Unit 142 ...
Страница 144: ...Section 12 Service MM147 D4 Hot Melt Unit 144 ...
Страница 146: ...Appendix A Password Levels MM147 D4 Hot Melt Unit 146 Setting Level 0 as Default Continued ...
Страница 148: ...Appendix B Power Requirements MM147 D4 Hot Melt Unit 148 ...
Страница 150: ...Appendix C Instruction Sheets for Option Kits MM147 D4 Hot Melt Unit 150 ...
Страница 208: ...5 Valco Melton IS0343 Anybus Installation Installation Continued ...
Страница 245: ...Appendix E Communication Protocols Modus MM147 D4 Hot Melt Unit 162 ...