YK08-0028-DI-002-08
xii
0.5 Acceptance and Storage of The Pump
0.5.1 Unpacking/Acceptance of The Pump
WARNING
1) When taking out the product from the box and lifting up the pump,
guide to use the cargo-handling equipment such as a crane utilizing
the eyebolt located at the upper part of the pump and to transfer lifting
it up. Confirm that there is no abnormality before using the eyebolts.
2) Only the technically entitled person should be in charge of conducting
the unloading operation and operating the unloading machinery.
3) There is a risk that the Pump might drop or lay down when attempted
unreasonable operation or machinery setup was not sufficient. You
are strictly restricted to enter beneath the Pump.
4) Since you may get injury due to an anchor being used in the box,
guide the worker to wear the leather gloves and to use the appropriate
tool.
Upon delivery of the product, check first that the delivered is exactly what you have ordered
and there is no break or damage through transport or the like. Claim after use of the product
might be resolved with a charge.
Although we pay full attention on shipping, you are kindly requested to check the following
upon unpacked the product.
IMPORTANT
1) Whether the delivered is exactly the one you have ordered.
2) Whether accessories (Pump oil for one lubrication, optional parts) are
attached or not.
3) Whether there is no break or damage through transport or not.
4) Whether any bolt or nut got loose or taken off through transport or
not.
Should you found any trouble, please do not hesitate to contact our
Sales division or your agency.
Содержание VD151
Страница 11: ...YK08 0028 DI 002 08 x 6 INLET 7 OUTLET...
Страница 12: ...YK08 0028 DI 002 08 xi Fig 1 Warning Label VD151 VD201...
Страница 24: ...YK08 0028 DI 002 08 6 Fig 2 VD151 Dimensional drawing...
Страница 25: ...YK08 0028 DI 002 08 7 Fig 3 VD201 Dimensional drawing...
Страница 32: ...YK08 0028 DI 002 08 14 Fig 6 Terminal box internal wiring diagram Fig 7 Electrical wiring diagram...
Страница 65: ......