SK00-4802-DI-002-04
No.16.10.20
13
3 Mounting
Please read "0.5 Pump acceptance and storage" and check the pump for any defects.
Install and operate this product according to the local and national safety
laws and regulations (such as fire laws and electric wiring code).
Accordingly, you are required to take classes for general safety that are
valid in the country and the local area at the site. No one who hasn't take
the classes can handle the product.
The operator is required to have taken such trainings.
In addition, the operator has expertise, skills, qualifications in electrics,
mechanics, cargo handling, vacuum, etc.
Before installing/removing, keep the product from all the energy sources
(electricity, cooling water, etc).
3.1 Installation
For installation, select a site with less dust and moisture, turn up the air inlet flange (loose type
flange) and install the flange in a horizontal position.
Lay out in consideration of installation, removal, inspection, cleaning, etc. of the pump (See Figs
2 to 5).
For the ambient conditions, see "0.5.3 Ambient conditions during storage, installation, and
operation."
3.1.1 Preparation
1) Remove the tape around the lead-in connection port for cooling water, and protection materials
for the inlet port of the baffle and the pumping ports (where the inlet and outlet ports are blocked
with protection materials), and then check the pump and the jet for damage.
2) Wipe the flange dry with alcohol etc.
3) Oil is poured at the factory but check the presence of the oil before use. (See section 3.2 Oil
filling)
Heating without oil may cause a break in a cable of the heater or damage to the boiler.
The pump is damaged if operated in a tilted, overturned, or upside-down
state. With the intake port facing upward (see Fig. 2, 3), install the pump
body horizontally.
WARNING
CAUTION