5.
Operation
5-1. Operating the RF power supply
5-1-1. Setup before operation
Before energizing the system, check that the cables between each unit are correctly wired.
Feed cooling water to the system. Make sure the water volume is the specified rate.
When the cooling water flow stabilizes, turn on the automatic matching controller's (AMC-9L) main
switch.
The automatic matching controller's self diagnostic starts. If there are no problems, the standby
screen appears.
(Screen example during self diagnostic)
(Standby screen: when normal)
Next, turn on the RF power supply's main breaker.
The RF power supply's self diagnostic starts. If there are no problems, the standby screen appears.
(Screen example during self diagnostic)
(Standby screen: when normal)
* The version and date may differ.