ULVAC CRYOGENICS INCORPORATED
31
example, when the system is in consecutive running, replacement should be
done every two years.
NOTE
: Coldhead cylinder and oil absorber are to be replaced with our stock.
Customers are requested to return the set of parts to us after replacing.
12.3 Regular customer inspection
The EMP-14A is a high pressure manufacturing equipment. Please follow the
applicable laws or regulations when operating and maintaining this equipment.
Be sure to turn off the main power source before performing maintenance.
WARNING
Since helium is filled in this equipment as well as in the maintenance parts
(cold head, oil adsorber), do not disassemble these parts. When you have to
disassemble or dispose such parts, discharge helium using the optional
charging adapter kit.
WARNING