ULVAC CRYOGENICS INCORPORATED
19
6.4.2
Connecting nitrogen tube
Connect the nitrogen gas tube to the nitrogen gas inlet connector located on the
dewar of EMP-14A. Connect the opposite side of nitrogen gas tube to the nitrogen
gas supply valve on the generator.
6.4.3
Connection of “Nitrogen gas generator” remote cable
Connect a remote cable to the remote connector located inside of EMP-14A and
the signal connector from the back of GN-10i , or “PRESSURE SWITCH OUT”
connector on the back of IM-120.
Fix the back panel of EMP-14A when all the connections are made.