Page 9 of 85 Pages
10.
Open the door slowly to allow steam to escape and wait 5 minutes before
you remove the load. When sterilizing liquids, wait 10 minutes.
11.
Once a month, ensure that the safety valves are functioning, and once
annually a certified tester must conduct pressure chamber safety tests.
12.
Once annually, or more frequently, effective tests must be performed, i.e.,
calibration and validation.
13.
Examine the condition of assemblies on a regular basis. Make sure there
are no leaks, breaks, blockages, whistles or strange noises.
14.
It is required to conduct maintenance operations as instructed.
15.
Immediately notify the person in charge of any deviation or risk for the
proper function of the device.
Содержание 5050
Страница 2: ......
Страница 6: ...Page 4 of 85 Pages TABLE OF CONTENT Cont DRAWINGS PAGE NO FRONT VIEW 17 REAR VIEW 18 ...