G. 35
Next, route the
Lat Cable (#11)
through the
Front Upright
4)
and over the Nylon Pulley 4 1/2 Rd. (#26-Labeled F), as shown.
FIG. 36
Next, route the
Lat Cable(#11)
through the
Adjustabl
Double Pulley Bracket (#40)
and under the Nylon Pulley 4 1/2 Rd. (#26
Labeled G), as shown above.
IG. 37
Next, route the
Lat Cable (#11)
through the
Adjustable Pulley
Bracket (#42)
and over the Nylon Pulley 4 1/2 Rd. (#26-Labeled H), as
hown above.
Note:
Use Cable Mapping Diagram on page 16 for further detailed
illustration of the
Lat Cable (#11)
routing.
FIG. 38
Next, attach the
Lat Cable (#11)
to the
Top Plate/ Selecto
Bar (#22)
and secure it into place using one Split Bolt 1/2-13 (#67) and
one Split Washer 1/2 (#66).
Refer to
Fig. B
on page 16 for furthe
illustration of this hardware assembly.
Fully Fasten
:
Proceed to fully fasten this hardware assembly.
CFM-500 Compact Frontal Machin
11
FULLY FASTEN