IG. 27
Insert one Nylon Pulley 4 1/2 Rd. (#26-Labeled A) into the
ulley bracket of the
Top Pulley Housing (#5)
and secure it into place
sing one Hex Head Cap Screw 3/8-16 X 1 3/4 (#50), two Flat Washers
AE 3/8 (#45) and one Nylon Insert Jam Lock Nut 3/8-16 (#48). Next,
egin routing the
Lat Cable (#11)
over the Nylon Pulley 4 1/2 Rd. (#26-
abeled A) and into the tube of the
Top Pulley Housing (#5)
, as shown
bove.
FIG. 28
Next, route the end of the
Lat Cable (#11)
through the other
pulley bracket located on the
Top Pulley Housing (#5)
. Then insert a
Nylon Pulley 4 1/2 Rd. (#26-Labeled B) into this pulley bracket and secur
the Nylon Pulley 4 1/2 Rd. (#26-Labeled B) into place using one Hex Hea
Cap Screw 3/8-16 X 1 3/4 (#50), two Flat Washers SAE 3/8 (#45) and on
Nylon Insert Jam Lock Nut 3/8-16 (#48).
Note:
Use Cable Mapping Diagram on page 16 for further detaile
illustration of the
Lat Cable (#11)
routing.
IG. 29
Install two Nylon Pulleys 4 1/2 Rd. (#26-Labeled C, E) into the
ulley bracket located on the
Press Bar Selector Housing (#2)
and
ecure them into place using one Hex Head Cap Screw 3/8-16 X 2 3/4
#47), two Flat Washers SAE 3/8 (#45) and one Nylon Insert Jam Lock
Nut 3/8-16 (#48).
FIG. 30
Next, install one Nylon Pulley 4 1/2 Rd (#26-Labeled D) ont
the pulley plate located on the
Front Upright (#4)
, as shown above, an
secure it into place using one Hex Head Cap Screw 3/8-16 X 1 3/4 (#50)
two Flat Washers SAE 3/8 (#45), one
Cable Retainer Bracket (#78)
an
one Nylon Insert Jam Lock Nut 3/8-16 (#48).
Note:
Be sure to position the
Cable Retainer Bracket (#78)
a
shown above.
Next, insert one Nylon Pulley 4 1/2 Rd. (#26-Labeled F) into the slot lo
cated on the
Front Upright (#4)
and secure it into place using one Hex
Head Cap Screw 3/8-16 X 2 1/2 (#44), two Flat Washers SAE 3/8 (#45
and one Nylon Insert Jam Lock Nut 3/8-16 (#48).
CFM-500 Compact Frontal Machin
9