Bezique
WaTEr rEquirEmENTS
The installation must be in accordance with
Water Regulations/bylaws.
To guarantee activation of the heating elements,
the shower must be connected to a mains water
supply with a minimum running pressure of
100kPa (1.0 bar) at a minimum flow rate of nine
litres per minute. The maximum static pressure
must be 1 000kPa (10 bar).
Note:
For the 10.5kW rated shower the
minimum running pressure must be 150kPa
(1.5 bar) at a minimum flow rate of eleven litres
per minute with a maximum static pressure of
1 000kPa (10 bar).
Note:
If the stated flow rates are not available,
it may not be possible to achieve the best
performance from the unit throughout the year.
For guidance on the running and static pressures
contact the local Water Authority or consult a
competent plumber.
During periods of high ambient temperatures it
may be necessary to select a low power setting
to achieve your preferred shower temperature.
The water supply can be taken from a cold water
storage cistern provided there is a minimum
head of ten metres above the showerhead
(fifteen metres for the 10.5kW rated shower). It
must be an independent supply to the shower
only.
If it is intended to operate the shower at
pressures above the maximum or below the
minimum stated, contact Customer Service for
advice.
Fig.
shows a typical system layout.
Do not use jointing compounds on any pipe
fittings for the installation.
Isolating
stopvalve
Mains
water
supply
Shower
unit
Switch may
be wall
mounted
in accordance
with IEE regs.
Mains electric supply
(via double pole switch)
Double
pole
isolating
switch
Separate permanently
connected supply
from consumer unit
Fig.
Diagrammatic view (not to scale)