
Finalizing the Installation
27
© Travis Industries
9/17/2020 - 1536
DVL EG GSR2
Steps for Finalizing the Installation
1. Remove the glass (see page 25).
NOTE:
If using propane (LP) convert the appliance prior to installing the logs.
2. We recommend you purge the gas line at this time (with the glass removed). This allows gas to be
detected once it enters the firebox, ensuring gas does not build up.
3. Make sure the accent light bulbs are in place and work correctly.
NOTE
: Take care to not touch the bulb with your fingers – use a cloth or paper towel).
Firebox Ceiling Accent Light
4. Install the four AA batteries (see illustration below). The AA batteries act as a power backup in case
the household (AC) power goes out and are required for operation. Install three AAA batteries into
the remote (see illustration below). Synchronize the transmitter to the IFC (see page 31).
5. Install the burner and media (and firebacks if applicable).
6. Replace the glass.
7. Start the heater.
8. Leak test all gas joints.
AAA Battery
AAA Battery
°F
AAA Battery
AA Battery
AA Battery
AA Battery
AA Battery