![Travis Industries 2003 ROF Скачать руководство пользователя страница 19](http://html.mh-extra.com/html/travis-industries/2003-rof/2003-rof_owners-manual_1154158019.webp)
Finalizing the Installation
19
Travis Industries
4030407
100-01146
Fountain Setup
1 Check for Proper Operation
•
Remove any packaging material or debris from inside the fountain.
•
Make sure all components are securely in place.
•
Remove the center perforated aluminum grate.
•
Turn on the gas, electrical and water supply to the fountain.
•
Rotate the blue lever arm on the left side of the gas control valve up to the vertical position.
•
Check the water level in the central tank. Tank should be ¾ full.
•
Start the fountain by following the
Operating Instructions
on next page.
SIDE VIEW OF GAS CONTROL
MANUAL SHUT-OFF VALVE IS AT THE ON POSITION
2 Check the Water Spray Height
•
The spray height is set in the factory at 24” high at the center spray. Set the spray height lower
for less water splash.
•
The water pressure to the spray head and spray ring maybe adjusted by turning their associated
control valves. See
Adjusting The Water Spray Height
on page 23.
3 Install Glass Beads or Rocks
•
Remove glass beads or rocks from packaging.
•
Carefully spread the glass beads or rocks evenly on the inner and outer perforated aluminum
grates. Be careful not to drop any material into the fountain tank or block the water spray head
and jets.