![Traub TNL20 Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/traub/tnl20/tnl20_operating-instructions-manual_1153101003.webp)
Table of Contents
3
Transport and installation
TNL20
DTE022EN - 02.08.2022
Explanation of symbols ...................................................................................................................... 7
Safety instructions and technical specifications .............................................................................. 7
Information on transport, installation, commissioning ....................................................................... 8
Installation plan TNL20, simplified ..................................................................................................... 11
Installation plan TNL20 with iXcenter, simplified ............................................................................... 12
Preparations ....................................................................................................................................... 13
Suitable transporting and lifting aids .................................................................................................. 13
Information for transporting the machine ......................................................................................... 14
Machine weight and machine dimensions ........................................................................................ 15
Space requirements .......................................................................................................................... 16
Floor condition ................................................................................................................................... 16
Ambient conditions ............................................................................................................................ 17
Floor trough ....................................................................................................................................... 17
Compressed-air supply ...................................................................................................................... 17
Operating material to be provided ..................................................................................................... 17
Pumps and tanks ............................................................................................................................... 17
Connection to local extraction system by customer ......................................................................... 17
Power supply ..................................................................................................................................... 18
Main circuit breaker ........................................................................................................................... 18
External data transfer ........................................................................................................................ 18
Chip removal ...................................................................................................................................... 19
Disposal of used operating materials ................................................................................................ 19
Observing the ground and wastewater regulations .......................................................................... 19
Preparing the machine for transport
............................................................................................. 21
Locations of the axes for attaching the transport locks ..................................................................... 21
Seal disconnected hose lines or pipelines ......................................................................................... 22
Corrosion protection .......................................................................................................................... 22
Fit transport locks and drip pan ......................................................................................................... 23
Transport lock – main spindle ........................................................................................................ 24
Transport lock – lower tool carrier,
front working attachment, and counter spindle ............................................................................ 25
Transport lock – upper tool carrier ................................................................................................. 26
Transport lock – workpiece removal unit ...................................................................................... 27
Содержание TNL20
Страница 6: ...Table of Contents 6 Transport and installation TNL20 DTE022EN 02 08 2022...
Страница 10: ...10 Transport and installation TNL20 DTE022EN 14 03 2022 Safety...
Страница 20: ...20 Transport and installation TNL20 DTE022EN 14 03 2022 General...
Страница 66: ...66 Transport and installation TNL20 DTE022EN 14 03 2022 Electrical connection...
Страница 68: ...68 Transport and installation TNL20 DTE022DE 24 06 2021 Operating material...
Страница 70: ...70 Transport and installation TNL20 DTE022DE 24 06 2021 Pneumatic connection...
Страница 72: ...72 Transport and installation TNL20 DTE022DE 24 06 2021 Switching on the machine...
Страница 73: ......