![Traub TNL20 Скачать руководство пользователя страница 65](http://html1.mh-extra.com/html/traub/tnl20/tnl20_operating-instructions-manual_1153101065.webp)
65
Transport and installation
TNL20
DTE022EN - 14.03.2022
Important notes
Caution! Danger to Life!
All work on the electrical equipment must be carried out ex-
clusively by properly trained qualified personnel.
The control voltages are connected on one side with PE according to
EN 60204-1. See the information on the electrical diagram.
The control cabinet may be opened only when the main switch is
switched off. While the main switch is switched on, the control cabi-
net must be secured according to valid safety standards.
See the order confirmation for the precise electrical requirements.
The electrical documentation supplied is definitive and binding. They
must be available to
INDEX TRAUB
's customer service at any time.
The machine must be connected to the electrical supply network via
the main switch (multi-wire cable). The connection must be made
with a clockwise rotating field.
The power connection is indicated in the wiring diagrams.
The machine is prepared for connection to three-phase power lines
(TN-S network).
Before connecting the machine, check that the existing power
settings and network form of the respective power supply company
match the ratings defined for the machine.
If this is not the case, an upstream transformer is required.
The feeder to the master switch on the control cabinet can be rout-
ed from above or through a duct in the base of the control cabinet.
The directives and regulations applicable in the country of use must
be followed.
Electrical connection
Содержание TNL20
Страница 6: ...Table of Contents 6 Transport and installation TNL20 DTE022EN 02 08 2022...
Страница 10: ...10 Transport and installation TNL20 DTE022EN 14 03 2022 Safety...
Страница 20: ...20 Transport and installation TNL20 DTE022EN 14 03 2022 General...
Страница 66: ...66 Transport and installation TNL20 DTE022EN 14 03 2022 Electrical connection...
Страница 68: ...68 Transport and installation TNL20 DTE022DE 24 06 2021 Operating material...
Страница 70: ...70 Transport and installation TNL20 DTE022DE 24 06 2021 Pneumatic connection...
Страница 72: ...72 Transport and installation TNL20 DTE022DE 24 06 2021 Switching on the machine...
Страница 73: ......