Transport and installation
TNL20
DTE022DE - 24.06.2021
Installing configuration levels and additional equipment
Installing the cooling lubricant system
Follow the manufacturer’s documentation
• Transport the cooling lubricant system to the machine and lift it off the pallet
using suitable lifting gear.
• Position the cooling lubricant system at the machine according to the instal-
lation plan.
• Remove the blanking plugs from the connection kits and connect the con-
nection kits to the machine and cooling lubricant according to the marking.
• Connect the hose of the lifting pump of the chip conveyor.
• Electrical connection of the cooling lubricant system
Example shown
Hose from lifting pump for chip conveyor
Connection kits
Содержание TNL20
Страница 6: ...Table of Contents 6 Transport and installation TNL20 DTE022EN 02 08 2022...
Страница 10: ...10 Transport and installation TNL20 DTE022EN 14 03 2022 Safety...
Страница 20: ...20 Transport and installation TNL20 DTE022EN 14 03 2022 General...
Страница 66: ...66 Transport and installation TNL20 DTE022EN 14 03 2022 Electrical connection...
Страница 68: ...68 Transport and installation TNL20 DTE022DE 24 06 2021 Operating material...
Страница 70: ...70 Transport and installation TNL20 DTE022DE 24 06 2021 Pneumatic connection...
Страница 72: ...72 Transport and installation TNL20 DTE022DE 24 06 2021 Switching on the machine...
Страница 73: ......