![Traub TNL20 Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/traub/tnl20/tnl20_operating-instructions-manual_1153101018.webp)
18
Transport and installation
TNL20
DTE022EN - 14.03.2022
General
Power supply
The guidelines and regulations applicable in the country of use must
be followed
The power supply cord to the machine should be as short as possible.
Use a sufficient wire size.
The power supply for the machine requires stable mains conditions; the max.
allowed operating voltage fluctuations are +10% or -10%.
The mains line must comply with the regulations of the local electricity supplier
and the VDE directives.
Main circuit breaker
Check that the building connection has sufficient capacity to cover
the additional load to be protected.
Discuss any unclear conditions with your local electricity supplier.
The main circuit breaker is not included in the delivery of the machine.
It must be installed outside the machine according to DIN EN 60204-1.
If a pre-transformer is required, the main circuit breaker must be installed after
the pre-transformer, i.e., on the secondary side. The fuse protection on the
primary side must be designed according to the connection data of the pre-
transformer.
The loads to be protected depend on the existing operating voltage.
For the information on machine connection, operating voltage, main fuse, see
the electrical diagrams or Chapter
Electrical connection
.
External data transfer
Data cables must not be routed directly next to live cables.
For data transfer to/from external computers or servers/storage devices, suit-
able metal conduits must be installed for the data lines.
The connection to the internal network (DNC) requires an RJ45 network cable.
An additional connection to the external network (IoT) must be made with a
separate RJ45 network cable.
Содержание TNL20
Страница 6: ...Table of Contents 6 Transport and installation TNL20 DTE022EN 02 08 2022...
Страница 10: ...10 Transport and installation TNL20 DTE022EN 14 03 2022 Safety...
Страница 20: ...20 Transport and installation TNL20 DTE022EN 14 03 2022 General...
Страница 66: ...66 Transport and installation TNL20 DTE022EN 14 03 2022 Electrical connection...
Страница 68: ...68 Transport and installation TNL20 DTE022DE 24 06 2021 Operating material...
Страница 70: ...70 Transport and installation TNL20 DTE022DE 24 06 2021 Pneumatic connection...
Страница 72: ...72 Transport and installation TNL20 DTE022DE 24 06 2021 Switching on the machine...
Страница 73: ......