Transport and installation
TNL20
DTE022DE - 24.06.2021
Installing configuration levels and additional equipment
Transport and installation of the chip conveyor and chip pan
Follow the manufacturer’s documentation
• Transport the chip conveyor and chip pan to the machine, then lift them off
the pallet and set them down with the aid of suitable hoisting gear.
• Remove the accessories and documentation from the chip conveyor or chip
pan if this has not been done already.
• The positions of the outer steering roller and adjustable foot might be
changeable depending on the variant of the chip conveyor. Installation here
is possible on the longitudinal side or front of the chip conveyor.
Risk of injury/crushing
Before the steering roller and adjustable foot are removed, the
chip conveyor must be secured accordingly to prevent it from
tilting.
Installation of chip conveyor
(Refer to the illustrations overleaf)
• From the operating side, push the chip conveyor under the machine as far as
possible, then slide it to the right as far as possible.
For custom applications on the left
For custom applications, the chip conveyor can be moved up to 600 mm to
the left (such as for custom requirements near the workpiece removal unit
to the left).
Risk of injury/crushing
A special cover and spacer plate (a) needs to be fitted on the
resultant opening.
• Lift the chip conveyor at the 4 adjustable feet (approx. 35 mm) until the
circumferential gasket strip presses against the machine base.
• Remove the blanking plugs from the hose lines and connect the hose lines.
• Connect the cooling lubricant pumps to the power supply.
Содержание TNL20
Страница 6: ...Table of Contents 6 Transport and installation TNL20 DTE022EN 02 08 2022...
Страница 10: ...10 Transport and installation TNL20 DTE022EN 14 03 2022 Safety...
Страница 20: ...20 Transport and installation TNL20 DTE022EN 14 03 2022 General...
Страница 66: ...66 Transport and installation TNL20 DTE022EN 14 03 2022 Electrical connection...
Страница 68: ...68 Transport and installation TNL20 DTE022DE 24 06 2021 Operating material...
Страница 70: ...70 Transport and installation TNL20 DTE022DE 24 06 2021 Pneumatic connection...
Страница 72: ...72 Transport and installation TNL20 DTE022DE 24 06 2021 Switching on the machine...
Страница 73: ......