![Traub TNL20 Скачать руководство пользователя страница 64](http://html1.mh-extra.com/html/traub/tnl20/tnl20_operating-instructions-manual_1153101064.webp)
64
Transport and installation
TNL20
DTE022DE - 24.06.2021
Installing configuration levels and additional equipment
• Remove the cover on the back and establish the pneumatic and electrical
connections of the workpiece removal unit at the interface provided.
• Remove the cover on the back and establish the electrical connection of the
workpiece removal unit at the interface provided.
• Fit the half-shell (b) required for the workpiece removal unit (refer to docu-
mentation
"Workpiece discharge through the counter spindle"
).
b
The two front adjustable feet of the finished part chute can be
removed for a short time to fit and remove the chip conveyor / chip
pan (for cleaning work, for example).
Содержание TNL20
Страница 6: ...Table of Contents 6 Transport and installation TNL20 DTE022EN 02 08 2022...
Страница 10: ...10 Transport and installation TNL20 DTE022EN 14 03 2022 Safety...
Страница 20: ...20 Transport and installation TNL20 DTE022EN 14 03 2022 General...
Страница 66: ...66 Transport and installation TNL20 DTE022EN 14 03 2022 Electrical connection...
Страница 68: ...68 Transport and installation TNL20 DTE022DE 24 06 2021 Operating material...
Страница 70: ...70 Transport and installation TNL20 DTE022DE 24 06 2021 Pneumatic connection...
Страница 72: ...72 Transport and installation TNL20 DTE022DE 24 06 2021 Switching on the machine...
Страница 73: ......